top of page
Combined Tank Farm
Contaminants
Petroleum
Size
250 x 100 ft
Location
100-500 m
Problem Severity
Unknown
Current Use
Fully-Utilized
Redevelopment Plan
Yes
DEC Database
No
Past Work on Site
First entered into the YRITWC database in 2006. The site was a berry picking location, was phased out as grass and weeds smothered berries. After fuel storage tanks were moved, the site was used to gather firewood.
Photos
1/4
bottom of page